Ok, the weather was really nice today, low 90's with low humidity so I was able to get some work done, too bad I got a late start. With the help of Danny and his new welder (I don't have 'mine' fixed yet) I was able to get the tubes tacked in place. That took most of the afternoon grinding to clean metal, fitting, clamping, welding...I was able to get a hood on it. I did have a 3 tab/post but it got swapped for a later one, one that is not are hard to find. I got the back seat in place and did some test fist for a few more braces. The tubes helped alot, but I want a bit more support. The W lid will be on the way to me later this month, same for the carbs. The tranny has not been clearanced yet so the engine sits under a cover for now.

Next Sunday I will be filling the gaps and gettting the cut and such filled. I will prob try to get some measurements made for the custom dash too.

Check out the first pic, nose bleed at that height!.

Image00004.jpg (210891 bytes) Image00002.jpg (203538 bytes) Image00005.jpg (202215 bytes)
Image00001.jpg (135125 bytes) Image00003.jpg (124776 bytes) Image00006.jpg (105009 bytes)